The image below shows the
new Phase Two building under construction, as viewed from the Control Tower
of neighbouring
Rochester Airport. The access road from the A249 can be seen to the left, with
the parkling areas to the right.
Click the image for
a larger view.
The image automatically updates every five minutes (press F5 for the update).
The camera switches
to a low light black and white version after sunset.
The images below are computer
generated representations of the completed building. The first view is from
approximately the
same position as somone standing in the area shown in the centre of the webcam.

Click each image for a larger view.